Tuesday, May 6, 2008

Digging goes on

After a long day of digging it only took a few minuets to fill the new basement hole with water from a miss place water main. The water was shut off by Lincoln DPW and the 6 inch main was plugged. It will be rerouted tomorrow.



Three new manholes were laid out to reroute the main sewer line. One will be right at the Stake just out side the new foundation.

Ryan was going to jump right in, but we talked him out of it.




Day two AM: The main sewer line the white pipe and the sewer from the original building in green will need to be moved to make room for our new basement. That will entail moving one or more manholes that the main sewer line runs through. You can only have a change in direction of the main sewer line at a manhole.

Step one clearing away the old hot top.





John Imbrescia and Ralph Lewis pose for a few shots. Jack Daly and Mike our builder are under exposed.

Prepping the site


Day one of the new home for the White Mountain Adaptive Snowsports.